How does Material Depot deliver solid wood flooring?

Short Answer
Solid wood delivery is more involved than vinyl or laminate due to weight, fragility, and acclimatization requirements.

DELIVERY TIMELINE:
1. In-stock Indian species (teak, sheesham): 7-14 days from order.
2. Imported European/American species: 6-14 weeks (often ex-shipping).

PACKAGING:
1. Solid wood planks bundled in cartons (4-6 planks per carton).
2. Heavy-duty packaging with corner protection.
3. Palletized for transit.
4. Carton weight: 25-40 kg.

WHAT TO CHECK ON DELIVERY:
1. Carton count vs delivery challan.
2. Visible damage on outer cartons.
3. Match batch numbers (critical - solid wood has natural variation; batch-matching reduces visual mismatches).
4. Photograph damage BEFORE signing.

ACCLIMATIZATION (CRITICAL):
1. Solid wood needs 14-21 DAYS acclimatization in install room (vs engineered's 7 days).
2. Open cartons in install room.
3. Allow wood to equilibrate with room temperature + humidity (40-60% RH ideal).
4. SKIPPING THIS STEP causes humidity-driven movement post-install.

PRE-INSTALL CHECKS:
1. Subfloor moisture <2% RH (tighter than engineered's <4%).
2. Plywood subfloor (12mm+) for nail-down.
3. Concrete subfloor with DPM for glue-down.
4. Room humidity stable 40-60%.
5. Acclimatization complete.

INSTALLATION COST:
1. Nail-down on plywood: Rs 80-150/sqft.
2. Glue-down on concrete: Rs 100-180/sqft.
3. Site-finishing: Rs 100-180/sqft.
4. Total install: Rs 200-450/sqft (including finishing).

POST-DELIVERY STORAGE:
1. Store flat in install room (never on edge).
2. Don't open cartons until acclimatization period start.
3. Cover with breathable sheet (not plastic) if dusty.
4. Maintain 18-30°C and 40-60% RH.

TYPICAL TIMELINE: 6-8 weeks from order to completed install (including acclimatization + site-finishing).

Detailed Explanation

Solid wood delivery and installation is more involved than vinyl or laminate due to weight, fragility, dimensional movement, and acclimatization requirements. Here is what to expect.

DELIVERY TIMELINE BY ORDER TYPE:

1. IN-STOCK INDIAN SPECIES (teak, sheesham, mango wood from Indian suppliers):
- 7-14 working days from order placement.
- Bangalore deliveries faster (7-10 days); pan-India 10-14 days.

2. IMPORTED EUROPEAN OR AMERICAN SPECIES (European oak, American walnut, hickory):
- 6-14 weeks if ex-stock at warehouse.
- 14-20 weeks if ordered against next shipment.

3. LARGE PROJECT QUANTITIES:
- Coordinate with our team for batch consistency across all cartons.
- Critical for solid wood - natural variation means different batches have noticeable colour shifts.

4. CUSTOM CUT OR CUSTOM FINISH ORDERS:
- 8-16 weeks lead time.
- Site-finishing extends project timeline by 5-14 days.

PACKAGING:

1. Solid wood planks bundled in cartons of 4-6 planks each.
2. Heavy-duty packaging with corner protection - solid wood plank edges are delicate.
3. Palletized for transit.
4. Carton weight: 25-40 kg (solid wood is significantly heavier than engineered).
5. Imported solid wood typically has additional shipping wrap.

WHAT TO INSPECT ON DELIVERY:

1. Count cartons against the Material Depot delivery challan - confirm match before signing.

2. Inspect each carton for visible damage - crushed corners, water marks, torn wrap.

3. CONFIRM BATCH NUMBERS - for solid wood orders covering 50+ sqm, ALL cartons should ideally be from the same production batch. Solid wood has natural variation; different batches can show significant colour/grain shifts that become visible across a continuous floor.

4. INSPECT PLANK ENDS - check for chips, cracks, or edge damage. Solid wood plank ends are sometimes damaged in transit.

5. PHOTOGRAPH any damage BEFORE signing delivery receipt.

ACCLIMATIZATION (CRITICAL - DON'T SKIP):

1. Solid wood needs 14-21 DAYS acclimatization in the install room. This is longer than engineered (7 days) or vinyl (24-48 hours).

2. OPEN CARTONS in the room of installation. Allow wood to breathe.

3. ALLOW WOOD TO EQUILIBRATE with room temperature and humidity.

4. TARGET CONDITIONS:
- Temperature: 18-30°C.
- Humidity: 40-60% RH.
- Stable conditions (no AC/fan blasts during acclimatization).

5. WHY ACCLIMATIZATION MATTERS:
- Solid wood absorbs/releases moisture from the air.
- Installing wood that hasn't equilibrated causes post-install movement.
- Movement = gaps in dry season, cupping in wet season.
- 14-21 day acclimatization minimizes post-install dimensional change.

6. SKIPPING THIS STEP is the #1 cause of solid wood installation problems.

PRE-INSTALL CHECKS:

1. SUBFLOOR MOISTURE TEST. Concrete subfloor must test below 2% RH (tighter than engineered wood's <4%). Use proper moisture meter.

2. SUBFLOOR LEVEL. Flat within 3mm per 1 metre.

3. PLYWOOD SUBFLOOR (for nail-down) - must be 12mm+ thick, structurally fastened.

4. CONCRETE SUBFLOOR (for glue-down) - needs DPM, dry, primed.

5. ROOM HUMIDITY STABLE. 40-60% RH for 7+ days before install.

6. ACCLIMATIZATION COMPLETE - full 14-21 days.

INSTALLATION COSTS:

1. NAIL-DOWN ON PLYWOOD: Rs 80-150/sqft.
2. GLUE-DOWN ON CONCRETE: Rs 100-180/sqft.
3. SITE-FINISHING: Rs 100-180/sqft (after install, sand and finish).
4. PRE-FINISHED FACTORY-FINISH: included in material cost.
5. PARQUET / HERRINGBONE: Rs 150-250/sqft installation (high skill required).
6. STAIR INSTALLATION: Rs 200-400/sqft (specialty).

TOTAL INSTALLED COST EXAMPLES:

1. STANDARD INDIAN TEAK PLANK, NAIL-DOWN, FACTORY FINISH: Rs 700-1200/sqft installed.

2. WIDE-PLANK EUROPEAN OAK, GLUE-DOWN, SITE-FINISHED: Rs 1000-1800/sqft installed.

3. AMERICAN WALNUT WIDE PLANK, GLUE-DOWN, SITE-FINISHED: Rs 1200-2000/sqft installed.

4. HERRINGBONE PARQUET (OAK OR WALNUT): Rs 1500-2500+/sqft installed.

5. VERSAILLES PARQUET: Rs 2500-4500+/sqft installed.

POST-DELIVERY STORAGE:

1. Store cartons FLAT in the install room (never on edge - solid wood plank weight bends them).
2. Don't open cartons until acclimatization start.
3. Cover with breathable sheet (cloth, not plastic) if dusty environment.
4. Maintain 18-30°C and 40-60% RH.
5. Keep away from heat sources (radiators, AC vents).

TYPICAL TIMELINE FROM ORDER TO COMPLETED INSTALL:

1. Order placement to delivery: 1-2 weeks (Indian) or 6-16 weeks (imported).
2. Acclimatization in install room: 14-21 days.
3. Subfloor prep: 2-3 days.
4. Installation: 3-7 days (typical 1200 sqft).
5. Site finishing (if applicable): 5-10 days.
6. Final cure before furniture: 3-5 days.
7. Total: 8-12 weeks from order to occupiable floor.

For premium projects, Material Depot coordinates all phases including:
1. Material order and tracking.
2. Site delivery scheduling.
3. Skilled installer assignment.
4. Quality inspection.
5. Warranty registration.

Solid wood is a multi-month investment that pays back over 50-100 years.